Espanol Francais Russian Arabic Portugues
英文 | 中文

+86 10 8599 9168 sales@petrolsteel.com

北京宏榫科技有限公司
  • 首页
  • 在线产品
    • 工业管道
      • 无缝钢管弯管
      • 大口径热扩无缝钢管
      • 承插口扩口螺旋管钢管
      • 直缝管弯管
      • 锻造合金管
      • 09CrCuSb耐硫酸低温露点腐蚀用钢管
      • 爆炸焊管
      • 空气预热器用10CrNiCuP波纹状考登管
      • 管件
      • 法兰
      • grayloc G-lok 高压自紧法兰
      • 阀门
    • 耐高温耐腐蚀材料
      • ODS合金MA956管材棒材
    • 电力能源
      • ACFR CFCC 绞合型碳纤维复合芯导线
      • 工业节电器
  • 工程项目
  • 新闻
    • Company News
    • Industry News
  • 联系我们
  • 关于宏榫
    • Quality Assurance
    • Group Organization
    • Concepts
    • Download

Quality Assurance

  1. 首页
  2. Quality Assurance

Quality Assurance

Certificates

API 5L 5CT TUV DVN ABS

Quality Assurance

PETROL STEEL CO., LTD has established a quality system in strict accordance with the ISO9001 standard, and obtained a certificate through the audit of the certification center. Each department of the company strictly implements the requirements and requirements of quality documents and technical documents such as "Quality Manual" and "Procedure Documents", earnestly fulfills quality responsibilities, and effectively carries out various productions.

Heavy Wall Steel Pipes
I. Contract Conversion:
According to the reviewed contract, the Production Task List is prepared. The technical department compiles the drawings to clarify the technical requirements of the forging product according to the contract requirements, formulates the blanking process, rolling / forging process, and heat treatment process according to the material and performance requirements, and executes according to the requirements.

Ⅱ. Raw Materials Control and Verification:
After the raw materials arrive at our factory, the raw materials are re-inspected, and the size, surface quality, and identification (mainly referring to the material and furnace number) are inspected. After passing the inspection, they are sent to the relevant departments for comprehensive inspection of the materials and a related report is issued.

Ⅲ. The Production Process Control:
The inspectors inspect each step of the process, and the products that pass the inspection are reordered with the "Mobile Card" signed by the inspector, and the unqualified products are executed according to the company procedure document "Control Procedures for Non-Conforming Products".
1. Cutting and cutting: Saw cutting according to the "Unloading Task List" strictly, and make inspection records, and batch cutting can be performed after passing.
2. Heating: Products of different materials and different furnace numbers cannot be heated in the same furnace.
3. Rolling or Forging: The operator performs forging according to the drawing. During the Rolling or forging process, an infrared thermometer is used to control the rolling or forging temperature of the forging.
4. Heat treatment: The thermocouples and temperature instruments are checked periodically. Strictly follow the process parameters and cooling methods such as the heating rate, heat preservation temperature, heat preservation time, etc. specified in the heat treatment process.
5. Machining: Processing according to the drawings, and mass production after the first inspection. During the process, the inspector conducts inspections and checks the processed products.
6. Inspection before packaging: The full-time inspector strictly inspects the machined product size, surface quality and logo according to the drawings, and then re-tests the product to prevent confusion.
7. Packaging process:
⑴ Typing: Type according to the typing notice in the "Production Task List". After the first self-inspection, the full-time packaging inspector performs the first inspection, and then performs batch typing after passing the inspection. The handwriting is checked for clarity during the process to ensure clear and neat typing .
⑵Anti-rust treatment: Anti-rust treatment (oil coating, spray painting, etc.) is performed according to customer requirements, the operator performs self-inspection as required, and the full-time packaging inspector performs first-item inspection, inspection, and process on the anti-rust treatment and surface quality as required. Inspection, qualified into the packing process, othERWise rework processing.

Ⅳ. Non-Conforming Products Control:
For the non-conforming products, the inspector identifies and isolates them, fills in the "non-conformity processing form" and sends it to authorized personnel for processing, and strictly implements the "non-conforming product control procedures" to ensure that non-conforming products are identified and controlled to prevent their unexpected Use or deliver.


One of The Kind, Millions of Choices
Superior Quality,
Prompt Delivery,
Favorable Feedback,
All Available in PESCO
Select PESCO, You Will Be Right!


Your inquiry would be highly appreciated. We would like to cooperate with you for long terms.

FacebookTwitterLinkedinInstagram

产品分类

  • 工业管道
    • 无缝钢管弯管
    • 大口径热扩无缝钢管
    • 承插口扩口螺旋管钢管
    • 直缝管弯管
    • 锻造合金管
    • 09CrCuSb耐硫酸低温露点腐蚀用钢管
    • 爆炸焊管
    • 空气预热器用10CrNiCuP波纹状考登管
    • 管件
    • 法兰
    • grayloc G-lok 高压自紧法兰
    • 阀门
  • 耐高温耐腐蚀材料
    • ODS合金MA956管材棒材
  • 电力能源
    • ACFR CFCC 绞合型碳纤维复合芯导线
    • 工业节电器

友情链接

Hs CodeGoogleWikimediaBaidu

内页左侧广告1

最新动态

  • COVID-19 Better Care Advices not only fo
    2020-03-19
  • New order alloy steel pipes JIS SCM440
    2020-02-25
  • Pipe Flange Dimensions
    2016-03-03
  • s355j0h vs s355j2h
    2020-03-17
  • Seamless pipe and tube and the manufactu
    2019-07-05

在线留言

联系我们

1404979930

+86 159 0035 7871

+86 10 8599 9168

sales@petrolsteel.com

petrolsteels

北京市朝阳区朝外大街甲6号万通中心A座4楼

微信扫一扫

  • Skype.
  • E-mail
  • Whatsapp
  • Inquiry
在线留言 !
在线留言 !

© 2020-2025 PETROL STEEL CO., LTD. All Rights Reserved. 北京宏榫科技有限公司 版权所有 京ICP备2020046398号-1 业务咨询:010-8599 9168